BOEING 737 MAX MODIFICATIONS (52)

Installation of HR-Smith Techtest 500-32 series portable ELT

The AML STC, effective for most commercial aircraft types, allows for installation of the 500-32 series survival ELT in the cockpit or cabin. 

The STC complies with the latest airworthiness requirements for installation of non-rechargeable lithium batteries per ETSO 142b.

--- STC approvals, EASA, FAA, TCCA, ANAC, HK CAD ---

View details

Halon Free Handheld Fire Extinguisher installation

Aptoz has developed the EASA and FAA AML STC effective for most aircraft types that allows for the installation of Collins Aerospace (Kidde) Halotron BrX handheld fire extinguishers in the cockpit and cabin. 

EASA and FAA STCs available.

View details

AOC/ATS Safety Voice SATCOM, ACARS over Iridium and FANS Datalink AFIRS 228

AFIRS™ (Automated Flight Information Reporting Systems) 228 family provides Iridium Global Voice & Data service in real-time, and offer a direct communication link to your aircraft, ensuring safe, secure operations and greater in-flight operational control.

 

AFIRS™ 228 models are designed and engineered to meet a variety of aviation requirements, such as AOC/ATS Safety SATCOM voice, ACARS over Iridium and FANS datalink.

 

AFIRS also includes ACARS like services such as automated block and flight times collection and reporting into operational systems, global flight tracking, two-way text messaging (iPad, MCDU), aircraft health monitoring including engine data collection for trending, engine/airframe exceedances, real-time flight data management.

View details

AED installation

The use of automated external defibrillators (AED) is essential to increase the chances of survival in case of a cardiac arrythmias such as ventricular fibrillation (VF) and non-perfusing ventricular tachycardia (VT) when used in the first 10 minutes.

AMC1 CAT.IDE.A.220 (b) (4) stipulates that the aircraft operators should carry automated external defibrillator (AED) on board all aircraft equipped with a first-aid kit and required to carry at least one cabin crew.

View details

G7 galley installation in 737MAX

The EASA STC developed by Aptoz installs full height G7 galley unit replacing existing underbin G7 galley unit.

View details

B737 NG SBAS GNSS Aircraft Integration by Fokker Services

Overview

Fokker Services offers a certified solution for the integration of Satellite-Based Augmentation Systems (SBAS) and Global Navigation Satellite Systems (GNSS), supporting modern navigation, surveillance, and performance-based operations. This upgrade ensures compliance with global mandates while delivering operational efficiency and precision.

View details

Repairs

Aptoz provides EASA or FAA approved repairs or repair specifications as:

  1. Unrepaired damage (fly-on) 
  2. Temporary repairs
  3. Permanent repairs

We repair composite and metal structure that is damaged beyond structural repair limits. We routinely provide MRO repairs for cowlings, thrust reversers and other removable components that the OEMs want you to remove and send to shop. We provide AOG fly-ons with unrepaired damage and also repairs to all parts of the fuselage, empennage, wings and other structure primary or secondary and also fatigue critical structure.  

We provide stage 1 (static), 2 (fatigue and damage tolerance) and 3 (inspection program) approvals. We can even provide stage 2 and 3 if the OEM has only provided stage 1. 

View details

Replace Halon by non-Halon fire extinguisher units

New european rule making will be come applicable:

•EASA HalonGuide Nov 2019

•EU: Regulation (EC) No 1005/2009

•EU: Commission Regulation (EU) No 2017/605

and will prohibit the use of Halon filled units per 1 Jan 2026.

View details

Aircraft Weight and Balance, Loading Schedule, AHM565, Trim Sheet

When introducing new aircraft into your fleet, or changing various items, such as interior layout, cargo layout, certified weights (MTOW/MLW/MZFW), the loading schedule of the aircraft is affected. This introduces changes to the flight envelope of the aircraft in the form of new curtailments for example.

View details

Full Y/C seats installation on B737-8 max delivered in 0 pax configuration

Contracted to develop a 189 Y/C pax on B737-8 MAX, PMV Engineering received the final EASA STC less than 5 months after the first discussions with the lessor.

View details