Installation of an Iridium Communications System
Satellite communication system upgrade in accordance with master drawing list document 2315-B61-MDL, revision A, dated July 28, 2010, or later FAA approved revision. Airplane flight manual supplement B2315-B61-AFM, Revision IR, dated December 14, 2010, or later approved FAA revision, is required.
Installation of an Iridium Communications System in accordance with Master Drawing List 2325-B47-MDL, Revision G, dated August 21, 2009, or later FAA approved revision. Airplane Flight Manual Supplement 2325-B47-AFM, Revision A, dated September 11, 2009, or later FAA approved revision is required.
Installation of an Iridium Communications System
Installation of electrical provisions for a Class 2B Teledyne Controls triple Electronic Flight Bag (EFB) system, Wingspeed XLLink/Iridium Communication System with Telephone Handset, Network Server Unit, and Ritec Rugged Inc.
Installation of an International Communications Group (ICG) ICS-120 Iridium Communications System.
Installation of upgraded Honeywell Enhanced Ground Proximity Warning System to include Runway Awareness and Advisory System (RAAS) software.
Installation of upgraded Honeywell Enhanced Ground Proximity Warning System to include Runway Awareness and Advisory System (RAAS) software.
Installation of the Iridium Communications System