Installation of replacement windshield and windows.
Fabrication and installation of an oil tank filler cap assembly in the above model rotor craft
Installation of a Shadin Co. Digital fuel flow indicating system, a temperature compensated digital fuel flow system, or a temperature compensated digital fuel quantity and fuel flow system.
Installation of Onboard Systems Model 200-231-00, 200-231-01, 200-231-02and 200-231-03 Cargo Hook Attachment Point Kitsin accordance withOnboard Systems Master Drawing List No. 155-038-00, Rev. 11 datedOctober 26, 2012 EASA.IM.R.S.01530 FAA STC SR00525SE
Installation of Night Vision Goggle (NVG) Compatible Lighting System
Fabrication of AMC Part Number AM369A1231 droop stop roller assembly.
Installation of Teledyne Battery Products G-641 and G-641S lead-acid battery.