Installation of AiResearch gas turbine GTCP30-92 auxiliary power unit.
Fabrication and installation of combination seat and toilet.
Installation of manually activated ignitor switches with G.E. ignition exciter unit P/N 4026T0301.
Installation of single point refueling system.
Relocation of thrust reverser hydraulic accumulator pressure gage.
Install capacitance type fuel gaging system.
Increase maximum zero fuel weight from 12,000 lbs. to 12,340 lbs.