Installation of main deck baggage/cargo system in accordance with FAA Approved Transequip Report 276181, (Controlled Drawing List for Transequip, Inc. Part Number 276155); Revision “VI”, dated August 16, 1984, or latter FAA approved revision.
Installation of main deck baggage/cargo system in accordance with FAA Approved Transequip Report 276181, (Controlled Drawing List for Transequip, Inc. Part Number 276155); Revision “VI”, dated August 16, 1984, or latter FAA approved revision.
Please contact modification supplier for further details.
STC Status: Reissued
STC Date: 12/01/12
Responsible Office: Los Angeles Aircraft Certification Office (ANM-100L), Tel: (562) 627-5200
Boeing Company, The