The EASA OPS regulation has mandate the CVR (Cockpit Voice Recorder) and FDR (Flight Data Recorder) with a 90 days ULB (Underwater Locator Beacon) by 16 June 2018.
In support to the airlines for compliance demonstration to these rules, PMV Engineering has developed 2 STCs (10067059 and 10062621) that cover several CVR and FDR manufacturers to upgrade the CVR and FDR from 30 days to 90 days ULB.
The upgrade of the CVR and FDR from 30 days to 90 days ULB.
These STCs deal with the latest EASA regulation in term of zonal safety analysis in case of ULB Lithium battery thermal runaway.
FDR and CVR upgrade - ULB 90 days - A300 / A310 and A320 family (incl. NEO)
Prior to installation of this change/repair it must be determined that the interrelationship between this change/repair and any otherpreviously installed change and/or repair will introduce no adverse effect upon the airworthiness of the product.
These STCs deal with the latest EASA regulation in term of zonal safety analysis in case of ULB Lithium battery thermal runaway.