Installation of provisions for dual CMC Electronics -CMA-1100 PilotViewTM Electronic...

Overview

STC Number
:
Contact Details
:

Introduction

Installation of provisions for dual CMC Electronics -CMA-1100 PilotViewTM Electronic Flight Bag (EFB) system Certification Basis The Certification Basis (CB) for the original product remains applicableto this certificate/ approval.The requirements for environmental protection and the associatedcertified noise and/ or emissions levels of the original product areunchanged and remain applicable to this certificate/ approval. Limitations -,,FAA STC FAA ST01966CH, reissued 14th January 2008-,,Pentastar Aviation Top Level Report No. 03TL-004, Revision J, dated10th January 2008-,,FAA Approved Airplane Flight Manual Supplement No. 05AFM-017 RevisionB, dated 7th October 2009- ,,Instructio (...) Conditions Compatibility of this design change with previously approvedmodifications must be determined by the installer.The equipment for which these provisions are intended has not beencertified. Additional EASA approval is required for the installation ofth (...)


Gulfstream G-IV, G300, G400, G-1159C
€ RFQ
Gulfstream GII, GIIB, IISP, G-1159
€ RFQ
Gulfstream GIII, G-1159A, G1159B
€ RFQ
Gulfstream GV
€ RFQ
Gulfstream GV SP, G500, G550
€ RFQ

Product Description

Installation of provisions for dual CMC
Electronics -CMA-1100 PilotViewTM
Electronic Flight Bag (EFB) system

Certification Basis
The Certification Basis (CB) for the original
product remains applicableto this certificate/
approval.The requirements for environmental
protection and the associatedcertified noise
and/ or emissions levels of the original
product areunchanged and remain applicable
to this certificate/ approval.

Limitations
-,,FAA STC FAA ST01966CH, reissued 14th
January 2008-,,Pentastar Aviation Top Level
Report No. 03TL-004, Revision J, dated10th
January 2008-,,FAA Approved Airplane Flight
Manual Supplement No. 05AFM-017
RevisionB, dated 7th October 2009-
,,Instructio (...)

Conditions
Compatibility of this design change with
previously approvedmodifications must be
determined by the installer.The equipment for
which these provisions are intended has not
beencertified. Additional EASA approval is
required for the installation ofth (...)

Please contact modification supplier for further details.

STC Status: Revision Level:
STC Date: 16/05/13
Responsible Office: EASA