Installation of a redundant system for the primary Cargo Hook system when conducting Human External Cargo (HEC) external loads operations
Installation of a redundant system for the primary Cargo Hook system when conducting Human External Cargo (HEC) external loads operations
Please contact modification supplier for further details.
STC Status: Reissued
STC Date: 28/12/21
Responsible Office: Seattle ACO Branch, Tel: +1 (206) 231-3500