Installation of left hand side and right hand side leading edge fuel cell assemblies. (F90 S/N LJ1 AND UP, 99 ALL S/N'S, B100 S/N B1-89 AND UP, 65-B80 S/N LD-151 AND UP)
Installation of left hand side and right hand side leading edge fuel cell assemblies. (F90 S/N LJ1 AND UP, 99 ALL S/N'S, B100 S/N B1-89 AND UP, 65-B80 S/N LD-151 AND UP)
Please contact modification supplier for further details.
STC Status: Reissued
STC Date: 05/05/09
Responsible Office: Atlanta Aircraft Certification Office (ACE-115A), Tel: (404) 474-5500
Hawker Beechcraft Corporation