Installation and integration of an auxiliary vapor cycle air conditioning system (VCS). STC SA9171SC-D must be installed prior to installation of this STC.
Installation and integration of an auxiliary vapor cycle air conditioning system (VCS). STC SA9171SC-D must be installed prior to installation of this STC.
Please contact modification supplier for further details.
STC Status: Reissued
STC Date: 21/03/03
Responsible Office: Ft. Worth Special Certification Office (ASW-190), Tel: (817) 222-5190
Bombardier Inc.