FLIR Mission Work Station EC135Optional installation of an operator station in the cabin for theoperation of mission equipment. The installation is based on ESGEngineering Order 1RPA-ZL-EO_00l in accordance with ESG Master DrawingList 1RPA-MDL-036-01 Issue 1 or later approved revision. EASA.R.S.01011
FLIR Mission Work Station EC135Optional installation of an operator station in the cabin for theoperation of mission equipment. The installation is based on ESGEngineering Order 1RPA-ZL-EO_00l in accordance with ESG Master DrawingList 1RPA-MDL-036-01 Issue 1 or later approved revision.
EASA.R.S.01011
Please contact modification supplier for further details.
STC Status: Active
STC Date: 04/06/09
Responsible Office:
EC635 T2+
EC635 P2+
EC635
EC135 T2 (CPDS)
EC135 T1 (CPDS)
EC135 T1 (CDS)
EC135 P2 (CPDS)
EC135 P1 (CPDS)
EC135 P1 (CDS)