Installation of fiberglass batt (DMS 2385 Type 2) insulation covered with polyimide and Tedlar materials to replace metallized Mylar insulation blankets.
Installation of fiberglass batt (DMS 2385 Type 2) insulation covered with polyimide and Tedlar materials to replace metallized Mylar insulation blankets.
Please contact modification supplier for further details.
STC Status: Surrendered
STC Date: 09/07/08
Responsible Office: Atlanta Aircraft Certification Office (ACE-115A), Tel: (404) 474-5500
McDonnell Douglas Corporation