Installation of the Centralized Water System in accordance with Drawing List Report No. F50-01095-2, Revision A, dated 6th September 1999 or later approved revisions. EASA.IM.A.S.02470 FAA STC SA7069SW-D
Installation of the Centralized Water System in accordance with Drawing List Report No. F50-01095-2, Revision A, dated 6th September 1999 or later approved revisions.
EASA.IM.A.S.02470
FAA STC SA7069SW-D
Please contact modification supplier for further details.
STC Status: Active
STC Date: 19/07/07
Responsible Office:
FALCON 50