Overview

STC Number
:
Contact Details
:

Introduction

Installation of video control center modification to Galley G4(structural provisions only).


McDonnell Douglas MD11
€ RFQ

Product Description

Installation of video control center modification to Galley G4(structural provisions only).

Please contact modification supplier for further details.

STC Status: Reissued
STC Date: 19/04/02
Responsible Office: Atlanta Aircraft Certification Office (ACE-115A), Tel: (404) 474-5500

McDonnell Douglas Corporation

  • MD-11