Installation of six (6) heavy duty tiedown rings in the aft cabin floor.
Installation of six (6) heavy duty tiedown rings in the aft cabin floor.
Please contact modification supplier for further details.
STC Status: Reissued
STC Date: 30/06/03
Responsible Office: Ft. Worth Rotorcraft Certification Office (ASW-170), Tel: (817) 222-5170
Eurocopter France