Installation of electrical Cabin Floor Heating Panels in accordance withEngineering Work Order EW-1999-000000.
Installation of electrical Cabin Floor Heating Panels in accordance withEngineering Work Order EW-1999-000000.
Please contact modification supplier for further details.
STC Status: Active
STC Date: 22/01/19
Responsible Office:
PA-46R-350T (MATRIX)
PA-46-500TP (MERIDIAN)
PA-46-350P (MIRAGE)
PA-46-310P