Installation of a Floor Mounted Litter System (FMLS)
Installation of a Floor Mounted Litter System (FMLS)
Please contact modification supplier for further details.
STC Status: Issued
STC Date: 19/12/07
Responsible Office: Denver Aircraft Certification Office (ANM-100D), Tel: (303) 342-1080
Eurocopter Deutschland GmbH