EMS Equipment P/N 135405-501/-502.Major Changes to EASA STC10017085:STC Rev. 1: To extend approval from P1/P2, T1/T2 to all EC135 models.STC Rev. 2: Introduction of reversible C/P seat installationconfiguration P/N 135331-503 into EMS equipment configuration P/N135405-501 and introduction of Integr... EASA.R.S.00397
EMS Equipment P/N 135405-501/-502.Major Changes to EASA STC10017085:STC Rev. 1: To extend approval from P1/P2, T1/T2 to all EC135 models.STC Rev. 2: Introduction of reversible C/P seat installationconfiguration P/N 135331-503 into EMS equipment configuration P/N135405-501 and introduction of Integr...
EASA.R.S.00397
Please contact modification supplier for further details.
STC Status: Revision Level REV. 3
STC Date: 25/11/16
Responsible Office:
EC135 T2(CPDS)
EC135 T1(CPDS)
EC135 T1(CDS)
EC135 P2+, EC135 T2+
EC135 P2(CPDS)
EC135 P1(CPDS)
EC135 P1(CDS)