Installation of forward baggage equipment rack and baggage floor.
Installation of forward baggage radio rack and seat rail.
Installation of a divan cargo net assembly per Raytheon Aircraft STC drawing list 800-197, Rev C dtd 8/24/01 or later FAA approved revision.