Installation of 5-blade propeller MTV-27-1-N-C-F-R(P)/CFR260-65a
Main battery No. 2 relocation.Validation of the TCCA STC SA10-4: Relocation of the main battery No 2from the tail section to the engine compartment.
Installation of LOGIC Engine Information System (EIS)
Installation of Hartzell 5-blade composite propeller modelHC-E5A-3A/NC10245B FAA STC SA03466CH
Installation of the Pratt <(>&<)> Whitney Engine Services FAST System.
Installation of a Pratt and Whitney PT6A-67P
Installation of a Pratt and Whitney PT6A-67P Engine upgradewithoptional 2nd Battery installation and optional Generator2 ExhaustDucting installation. FAA SA02266LA
5-blade MTV-27-1-N-C-F-R(P)/CFR260-65a Propeller on PilatusPC- 12. EASA.A.S.03217
Installation of a Garmin GMA-340 Audio Panel. Data required: I)Engineering Order TSAPCI2-23.50.01EO.
Installation of the Pratt & Whitney Engine Services FAST System