Overview

STC Number
:
Contact Details
:

Introduction

Structural provisions for 747-8i belly camera installation between theNLG bay and the belly fairing at the lowest pointof the fuselage. Itcontains:- Attachment to the aircraft structure through brackets- Outside fairing- Installation of awiring feed-through


Boeing 747
€ RFQ

Product Description

Structural provisions for 747-8i belly camera installation between theNLG bay and the belly fairing at the lowest pointof the fuselage. Itcontains:- Attachment to the aircraft structure through brackets- Outside fairing- Installation of awiring feed-through

Please contact modification supplier for further details.

STC Status: Revision Level REV. 2
STC Date: 11/10/13
Responsible Office:

747-8