Installation of BACN Mission Payload Integration in accordance with FAA Approved Master Drawing List 10-BD700-100, Revision “J” dated August 15, 2011, or later FAA approved revisions.
Installation of BACN Mission Payload Integration in accordance with FAA Approved Master Drawing List 10-BD700-100, Revision “J” dated August 15, 2011, or later FAA approved revisions.
Please contact modification supplier for further details.
STC Status: Issued
STC Date: 02/09/11
Responsible Office: Los Angeles Aircraft Certification Office (ANM-100L), Tel: (562) 627-5200
Bombardier Inc.