Installation of a refuel/defuel power switching system. Installation of this STC is dependent upon a previously FAA-approved installation of an electrical pressure feed-thru or electrical disconnect at approximately fuselage station 521 between STGR23R and STGR24R under right wing root fairing.
Installation of a refuel/defuel power switching system. Installation of this STC is dependent upon a previously FAA-approved installation of an electrical pressure feed-thru or electrical disconnect at approximately fuselage station 521 between STGR23R and STGR24R under right wing root fairing.
Please contact modification supplier for further details.
STC Status: Issued
STC Date: 09/04/03
Responsible Office: Boston Aircraft Certification Office (ANE-150), Tel: (781) 238-7151
Bombardier Inc.